Friday, September 1, 2017

All Underground Work now Completed. Asphalt Surface Paving being Scheduled.

Work Performed, August 28th to September 1st  
·         Excavated to ensure the existing pipe was intact due to concerns following internal televising

Work to be Performed:
·         Pave final layer of asphalt 
·         Sod Restoration, to be performed in mid-September when growing conditions are typically more favorable.

The Village is continuing to work with the contractor to schedule the final surface layer of asphalt pavement. All excavations are now completed and asphalt paving is being scheduled as soon as possible.